BYSS, Hayes

BYSS, Hayes

Nationwide Structures were tasked with the design, supply and construction of this new storage unit for BYSS in Hayes at the start of 2021, which was completed within 5 months of the start date. The layout of this has a unique design as it was asymmetrical; one elevation was longer than the opposite site, creating a slanted effect to achieve a trapezium shape of the building along with its sloped mono-pitch roof. A canopy was also incorporated into the design along with a lift shaft running up past the roof level. All steel was primed with High Build Zinc Phosphate.

Project Details

Completed

May 2021

Type

Project Gallery

An image of the BYSS structural frame in Hayes being constructed