Burgess Pet Care, Pollington

Burgess Pet Care, Pollington

This extension to Burgess Pet Care involved Nationwide Structures being contracted to supply, fabricate and erect a 5-floor single-span structure inside Burgess Pet Care facility which would create a new drier and cooler, starting on site during August, and all the steel involved was primed with a light grey high build zinc phosphate to 75 microns. The floors were elevated from ground level and the build also included fitting durbar flooring, along with a set of stairs and handrails to go with.

Project Details

Completed

October 2015

Type

Project Gallery