Guhring Ltd – Aston

Completed on:01 Jun 2016 Location:Aston Sector: Commercial / Industrial

Our brief was quite extensive for Guhring’s new UK Head Office and production facility. Our works included the supply, fabrication and erection of the 5400m2 portal frame with offices and the mono-pitch Waste Station. In addition to this we were also contracted to supply and install the metal decking to the floors including the concrete pour. And finally, the slinging and installation of the precast stairs and lift shaft. On site during the summer of 2016, and just like Guhring’s own manufacturing, the project ran with great precision.