Guhring Ltd, Aston

Guhring Ltd, Aston

Our brief was quite extensive for Guhring’s new UK head office and production facility. Our works included the supply fabrication and erection of the 5400m2 portal frame with offices and the mono-pitch Waste Station. In addition to this we were also contracted to supply and install the metal decking to the floor including the concrete pour along with landing the pre-cast stairs and lift shaft. And finally, the slinging and installation of the precast stairs and lift shaft. On site during the summer of 2016, and just like Guhring’s own manufacturing, the project ran with great precision.

Project Details

Completed

August 2016

Type

Project Gallery